Generator GPS Tracker Sample Checklist
A seven-item blank record for discussing power, required data, coverage, platform receipt, installation fit and acceptance. Fill it in with the people responsible for the project; it is a worksheet, not a report of completed tests.
Record the question, owner, evidence and result for each check.
The operator, installer and receiving-platform provider should agree who will perform each check and what they will accept. LEXUNYU can coordinate hardware documents and sample discussion; no sample test is claimed as completed here.
Copy the table below into your project document. Before testing, write the required result and the source of each value. During a sample check, record the model and configuration, who observed it, the date, evidence reference, actual result and any open item. For data fields, distinguish a controller or sensor reading from a tracker event and note units and expected reporting interval.
If considering a solar supply system, verify the selected tracker and charging system together for the site and reporting profile. A700 is documented as a wired 9–90 V option; it is not a solar or battery-only tracker.
Seven items to capture before a purchase decision
Leave the record column blank until the responsible person checks the project setup. Write “unknown” or “not checked” when evidence is missing.
| Item | What to confirm / how to check | Record / owner / status |
|---|---|---|
| Power and shutoff | Measure or identify the available supply. Observe tracker behaviour while the generator runs, stops and remains parked; note any backup-power requirement. | |
| Required data | List location, movement, runtime, fuel, temperature or other required items. Identify the source and confirm it is available in the exact device configuration. | |
| Coverage | Check destination country, operator/network availability at operating sites, signal gaps and expected store-and-forward behaviour with the selected device. | |
| Position, time and events | Compare reported position and timestamp with an agreed reference; trigger agreed movement/geofence or power events and record receipt time. | |
| Platform fields | Map device output, names, units, timestamps and reporting interval to the customer’s receiving fields. Confirm protocol and server settings with the platform provider. | |
| Installation and model fit | Match supply, enclosure, mounting, cable entry, vibration and exposure to the model’s documents and actual installation. Record unresolved items. | |
| Decision and sign-off | Customer / operator, installer and platform provider record acceptance conditions, failures, evidence reference and next action. |
Return to the generator tracker selection page to compare requirements and power routes. Each data sheet supports shortlisting; confirm manufacturer-issued documents and the exact model or variant for the project.