Telematics for Excavator & Equipment Rental
Create a reviewable record of machine location, available operating hours and selected movement events for rental and leasing workflows.
Looking for the full guide? For the hardware decisions on plant see GPS trackers for equipment, and for the business case see why you need a tracker on heavy equipment.
Investigate operating-hour questions
Rental disagreements often include 'how many hours did it run'. A compatible and validated source can add a shared operating record for review alongside the rental agreement.
Review off-hire and unexpected movement
When the selected hardware and platform support the required events, site-boundary or after-hours movement can give the team an earlier reason to investigate.
Why rental firms ask us
We help rental teams compare enclosure, power, mounting, coverage and available machine-data paths, then check how the selected records reach the existing system.
Hardware for rental records
When an excavator exposes compatible CAN/J1939 data, a suitable gateway can be evaluated for engine-hour or fuel-related fields; the exact records still need to be confirmed on the machine and receiving platform. Compare the A300 industrial gateway for an interface-rich wired installation with the A700 only for a powered outdoor tracking path where machine-data integration is not required. For mounting, power supply and field-condition decisions on site machines, see construction machinery tracking.
What the record should show
Keep the meaning of each hours value visible. A machine counter, ignition-derived powered time and movement-based estimate are different records. Confirm which source the exact hardware and receiving platform can provide before relying on it for a rental workflow.
Four checks before a rental-fleet rollout
- Handover and return
- Record the machine identifier, available counter reading and timestamp at both handover and return. Compare the platform record with the same source and period; investigate resets or gaps before using a difference.
- Transport between sites
- Observe a transport period separately from an operating period. Check whether movement or vibration contributes to the selected hours calculation. Do not label a movement-derived total as machine-counter hours.
- Powered on, idle and working
- Compare known operating states against the reported value. Ignition-derived time does not by itself distinguish productive work from idle time. Agree whether that distinction is required and whether a verified source supports it.
- Offline and off-hire
- Check what happens during a cellular outage and after reception resumes. Keep event time and receipt time separate, record any missing readings, and confirm how the platform applies the agreed rental-period boundary.
Use the blank machinery installation and data record to retain the configuration, source, timestamps and evidence. These are proposed checks, not completed test results. The rental parties agree how accepted records will be used; a tracking record does not automatically determine a charge or resolve a dispute.
For a hardware review, share the machine models and years, country, available power, receiving platform and whether you need location, machine-counter hours or another explicitly defined measure.
Certification per market
CE, FCC, RoHS and similar marks differ by destination. We document what each supplier can evidence and confirm the applicable marks at order time.

Start with the operation, then verify the hardware path.
We support fleet and equipment operators as well as telematics providers, integrators, installers and distributors. The work is to define requirements, compare available evidence, coordinate samples and check the data path before a wider decision.
Define the working requirement
Document the vehicles, equipment or assets, installation conditions, required signals and receiving platform before comparing models.
Compare evidence and samples
Review supplier documents, available interfaces and sample output. Anything not supplied remains an open item rather than an assumed capability.
Coordinate the data path
Confirm the protocol, fields, accessories, server settings and installation details required by the selected project.
Tell us the operation and the open questions.
We will reply with the checks still needed and an initial hardware direction.
Discuss your requirement